Common Conveyor RFQ Mistakes That Delay Projects

A practical list of RFQ mistakes that cause delays, along with the data needed to avoid rework.

6 min readUpdated for UAE procurement
Technical Specs

Materials

  • RFQ inputs for conveyor systems

Sizes

  • Layout, load, speed, and control data

Standards

  • Documentation and approval requirements

Problem this solves

Missing or unclear data causes RFQ delays. This guide lists the most common issues to avoid.

Common mistakes

MistakeImpactFix
No layout drawingDesign delaysProvide a marked plan
No load dataDrive sizing riskShare load per meter
Missing speed targetCapacity mismatchSpecify throughput

How to avoid delays

  1. 1Send layout drawings or site photos with measurements.
  2. 2List product dimensions, weight, and throughput.
  3. 3Specify incline, transfer points, and environment.
  4. 4Define control and safety requirements.

RFQ checklist

  • Layout length, width, and elevation
  • Product dimensions and weight
  • Throughput and speed targets
  • Controls and safety requirements