Installation and Commissioning Checklist for Conveyor Systems

A commissioning checklist for conveyor systems covering alignment, testing, and handover steps.

6 min readUpdated for UAE procurement
Technical Specs

Materials

  • Installation and commissioning scope

Sizes

  • Line length and testing scope

Standards

  • Site safety and commissioning requirements

Problem this solves

Incomplete commissioning leads to repeat issues. This checklist covers the core steps before handover.

Commissioning steps

  1. 1Verify alignment and level across the line.
  2. 2Confirm drive rotation and speed control.
  3. 3Test with load for tracking and stability.
  4. 4Document settings and operator guidance.

Handover checks

AreaCheckNotes
SafetyGuards and E stopsTest all points
DriveSpeed and torqueVerify under load
BeltTracking and tensionNo drift

RFQ checklist

  • Installation timeline and shutdown window
  • Testing and commissioning scope
  • Operator training needs
  • Documentation and handover requirements

Related links: unknown node, unknown node, unknown node.

Related Products
Specification Verification Available

Plan a clean commissioning

Share installation timeline and site constraints.