Problem this solves
Incomplete commissioning leads to repeat issues. This checklist covers the core steps before handover.
Commissioning steps
- 1Verify alignment and level across the line.
- 2Confirm drive rotation and speed control.
- 3Test with load for tracking and stability.
- 4Document settings and operator guidance.
Handover checks
| Area | Check | Notes |
|---|---|---|
| Safety | Guards and E stops | Test all points |
| Drive | Speed and torque | Verify under load |
| Belt | Tracking and tension | No drift |
RFQ checklist
- Installation timeline and shutdown window
- Testing and commissioning scope
- Operator training needs
- Documentation and handover requirements