Problem this solves
Most delays come from missing layout and throughput data. This guide lists the details needed to quote quickly.
Specification steps
- 1Provide a layout drawing or marked site photo.
- 2List product dimensions, weight, and packaging type.
- 3Share throughput target and speed requirements.
- 4Confirm incline or decline angles and transfer points.
Key data checklist
| Data | Why it matters | Example |
|---|---|---|
| Load per meter | Drive sizing | 35 kg per meter |
| Throughput | Capacity planning | 1200 cartons per hour |
| Speed | Belt and motor selection | 18 m per min |
RFQ checklist
- Layout length and width with drawings or photos
- Product dimensions and weight per unit
- Load per meter and throughput target
- Speed range and duty cycle
- Incline or decline requirements
- Environment and temperature range
- Power supply and controls