Problem this solves
Under sizing throughput leads to bottlenecks. This guide shows how to calculate capacity using real inputs.
Example calculation
| Input | Value | Result |
|---|---|---|
| Speed | 20 m per min | 1200 m per hour |
| Product pitch | 0.5 m | 2400 units per hour |
| Load per unit | 8 kg | 19.2 tons per hour |
Calculation steps
- 1Confirm line speed and product pitch.
- 2Calculate units per hour based on spacing.
- 3Multiply by unit weight for mass throughput.
- 4Add a buffer for downtime and peaks.
RFQ checklist
- Product pitch and dimensions
- Speed target
- Unit weight
- Peak and average throughput
Related links: unknown node, unknown node, unknown node.

